The first phase of the project will consist of the reactor’s design, preparation of licensing documentation and formal application of the construction license. The second phase includes the detailed design, construction management, equipment and component supply, obtaining the operational license, system installation, testing and its implementation and operation. INVAP will also provide all the supplies required to operate the future plant, as well as the operators’ technical training.
Stages
Stages
The safety studies in order to obtain the construction license granted by the Dutch Nuclear Regulatory Authority will include aspects related to the environment, nuclear safety, and compliance with the applicable Dutch and European legislations, among other optimal solutions that guarantee a high level of reliability, availability and performance.